Solve has been involved in over 200 process improvement projects, namely:
- Design and fabrication of certified removable and fixed platforms for temporary scaffolding, to eliminate time and cost during shutdowns.
- Design, certification, fabrication and installation of conveyor drop zone protection.
- Design of certified lifting equipment to assist in Pulley removal.
- Design, manufacture and installation of new modular crusher guards.
- Redesign and manufacture of ceramic lined belt filter crossover pipes.
- Designed and fabrication of a 200T ventilation shaft.
- D&C Projects include;
- Reclaimer Bogie & Crusher countershaft removal jigs
- D11 Track storage frames and truck tray access platform
- Belt feeder removable walkway, adjustment spanner & hood lifting frame
- Solid grizzly location pins
- Lifting jig transport frame
- Secondary crusher lube spools
- Crusher vault safety grates
- WA1200 access platform
- D11 dozer access stairs
- Conveyor roller transport / storage pallets
- Ore car scraper

