Project Summary
MCL5 Passivation Tower Upgrade, including supply and Install DN150 Carbon Steel Reticulated Water Piped Supply and Return.
Cost
$3 mil
Year Completed
2017
Project Scope
Solve Engineering designed, improvised and installed a 320-metre double DN150 water pipe supply run, transitioning throughout 3 buildings. Commencing with a critical 'hot tap' into the fully active main supply water line, and terminating on the Arc Tower where it supplies a multitude of heavy industrial process machines with Potable fresh water. The pipe run was fully TIG Welded to ensure the highest quality welds, and present the lowest 'hot work; hazard impact to numerous heat sensitive installations encountered below the pipe rack.
Solve Solution
An Integrated Engineering Solution [I.E.S] including design concepts, project labour personnel and fabrication capabilities. The pipe run required very advanced Rigging techniques and the coordinated use of Duel Cranes and multiple Boom Lifts simultaneously.